Mostrar registro simples

dc.contributor.advisorSchäfer, Maurício
dc.contributor.authorMacedo, Amanda Matos de
dc.contributor.otherGarlet, Givanildo
dc.contributor.otherCecconello, Vinício
dc.date.accessioned2023-02-14T16:21:10Z
dc.date.available2023-02-14T16:21:10Z
dc.date.issued2022-12-20
dc.date.submitted2022-12-02
dc.identifier.urihttps://repositorio.ucs.br/11338/11565
dc.descriptionNos dias atuais, a utilização do concreto armado e alvenaria estrutural são amplamente empregados em empreendimentos de variados setores da construção civil. No entanto, as manifestações patológicas estão presentes na maioria das edificações, resultando na redução de vida útil e durabilidade. O presente trabalho busca avaliar a paridade de manifestações patológicas na fase de pós-obra de dois diferentes métodos construtivos, com diferentes períodos de uso, através da análise de dados compartilhados por empresa construtora atuante à nível nacional, obtidos pelo setor de assistência técnica do pós-entrega. E através disso apresentar a importância da prevenção durante a concepção do projeto e execução, a fim de minimizar as ocorrências de não conformidades após a entrega para o usuário final. Para o desenvolvimento do trabalho, foram realizados estudos em oito empreendimentos, sendo quatro em alvenaria estrutural, com idades que variam de 1 a 5 anos, e quatro em concreto armado, com idades que variam de 1 a 2 anos. Cabe salientar que os empreendimentos citados ao longo do trabalho estão localizados em diferentes regiões do país, e a coleta e análise de dados de pós-obra foram realizadas com auxílio do software Power BI. Após o levantamento de dados em relação aos registros de manifestações patológicas e dos custos relativos ao pós-obra de cada empreendimento, foram feitos comparativos entre métodos construtivos a fim de analisar se existe alguma ligação dos resultados em relação a região de localização ou ao próprio método construtivo utilizado. Ao avaliar os grupos de sistemas e suas principais manifestações patológicas, pode-se observar que os problemas com maiores periodicidades apareceram de maneira semelhante nos empreendimentos, mesmo sendo métodos construtivos diferentes e localizados em diferentes regiões do país. Quanto aos custos dos dois métodos construtivos, não ocorreram padrões de comportamento nas porcentagens dos períodos analisados em relação aos gastos gerados no pós-obra em referência ao orçamento total. [resumo fornecido pelo autor]pt_BR
dc.description.abstractNowadays, the use of reinforced concrete and structural masonry are widely used in projects in various sectors of civil construction. However, pathological manifestations are present in most buildings, resulting in reduced service life and durability. The present work seeks to evaluate the parity of pathological manifestations in the post-construction phase of two different construction methods, with different periods of use, through the analysis of data shared by a construction company operating at a national level, obtained by the post-construction technical assistance sector-delivery. And through this, present the importance of prevention during project design and execution, in order to minimize occurrences of nonconformities after delivery to the end user. For the development of the work, studies were carried out in eight projects, four in structural masonry, with ages ranging from 1 to 5 years, and four in reinforced concrete, with ages ranging from 1 to 2 years. It should be noted that the projects mentioned throughout the work are located in different regions of the country, and the post-construction data collection and analysis were carried out with the help of Power BI software. After collecting data in relation to the records of pathological manifestations and the costs related to the post-construction work of each project, comparisons were made between construction methods in order to analyze whether there is any connection between the results in relation to the region of location or to the method itself. constructive used. When evaluating the groups of systems and their main pathological manifestations, it can be observed that the problems with greater periodicity appeared in a similar way in the projects, even with different construction methods and located in different regions of the country. As for the costs of the two construction methods, there were no patterns of behavior in the percentages of the periods analyzed in relation to the expenses generated in the post-construction period in reference to the total budget. [resumo fornecido pelo autor]pt_BR
dc.language.isoptpt_BR
dc.subjectEngenharia civilpt_BR
dc.subjectConstrução civil - Inspeçãopt_BR
dc.subjectConcreto - Tratamentopt_BR
dc.subjectEdifícios - Manutençãopt_BR
dc.titleAnálise das principais manifestações patológicas no pós-obra em edificações de diferentes regiões do país de uma construtorapt_BR
dc.typeMonografiapt_BR
mtd2-br.advisor.instituationUniversidade de Caxias do Sulpt_BR
mtd2-br.program.nameBacharelado em Engenharia Civilpt_BR
mtd2-br.campusCampus Universitário de Caxias do Sulpt_BR
local.data.embargo2022-12-19


Arquivos deste item

Thumbnail

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples